Stock count

The Stock count tab on Inventory & Suppliers is a rolling daily count, not a once-a-year shutdown. The same count is in the MechIQ app (Inventory → Stock count): start on the tablet, carry on with the phone at the shelves -- it is one count.

Today's list

Press Start stock count. MechIQ picks up to 20 parts with a fixed rule (not AI) and lists them in shelf order, so you walk the stores once. Parts with no shelf come last. These parts come first:

  • parts Never counted, or not counted for longest (Last counted N days ago);
  • parts Used often this month;
  • High-value parts;
  • parts Near their reorder point.

Each row says why the part is on the list.

Counting

Each row has a Count box. The box starts empty, and the page does not show what the system expects. Count what is on the shelf and type it. This is a blind count: a box that started with the expected figure could be confirmed without counting.

  • Every count saves as you type (the row says Saved). You can leave the page, reload it, or move to the app -- the counts are still there.
  • The shelf box shows the part's shelf. If the part is somewhere else, type the right shelf. Blank it to clear the shelf.
  • To count a part that is not on the list, type its part number or barcode and press Add to count, or press Scan barcode (a browser with a barcode reader, and the app).
  • Fluids can be counted in litres (4.5). A part counted in litres (Inventory → Edit part → Counted in: Litres) says Count in litres on its row: count the litres, a part-full drum included. Other parts are counted in whole units -- MechIQ tells you at once if a count is not a whole number.

Submitting

Press Submit count (N counted). That is the one step: MechIQ corrects the stock and shows one message -- how many parts were counted, how many stock levels changed, how many were not counted, and the difference at cost. Each part that changed shows system N → counted N.

  • Parts you did not count are left as they are.
  • Each change is written to the stock ledger as Counted (expected N, counted N).
  • A part used on a job between your count and the submit is not counted back onto the shelf: MechIQ applies the difference you found.

Discard count (front desk and owner) throws the open count away, after a confirm.

Variance trends

Open Variance trends to see how your counts add up over 3 months, 6 months or 12 months:

  • Counts, Units missing and Shrinkage value.
  • A monthly chart of units missing, once you have more than one month of counts.
  • By category -- where the discrepancies are concentrated.
  • Largest discrepancies -- the parts that keep going missing.

Shrinkage is stock missing at count, valued at the part's default unit cost (ex VAT). Overages (shown as +) usually mean a delivery or a part used on a job wasn't recorded -- a process gap, not free stock.

Reserved stock

Reserved stock (parts set aside for booked jobs) is on the Overview tab, in Reserved for jobs. A count can find reserved stock sitting on the shelf -- it is still yours until the job is collected.

Tips

  • Count something every day. Ten minutes daily beats a weekend with a clipboard.
  • Fix shelves as you count. It's the cheapest moment to do it.
  • A part that shows up in Largest discrepancies month after month usually has a handling problem, not a theft problem.